E34E99FEDF39C36283E7984B2A50659C Cabinet Committee on Economic Affairs approves ₹12,343 cr for six multi-track rail projects to reduce congestion, minimise logistics costs

Cabinet Committee on Economic Affairs approves ₹12,343 cr for six multi-track rail projects to reduce congestion, minimise logistics costs

The projects will add 1,020 km to the Railways network in six States; likely to be completed by 2029-30; to create smoother operations, improve punctuality, reduce congestion, boost line connectivity

from | The Hindu https://ift.tt/UREIjYm
via IFTTT

Post a Comment

Previous Post Next Post